While a lot of the exterior work was going on, we had a crew inside doing the drywall. Boy, these guys are FAST!!! And really messy. You’ve never seen anything so messy as drywall, and it’s not just the dust. But, as usual, let’s start with just before, where the remaining walls that were not ThermaSteel SIPs were covered with reflective foil. Heat reflection and insulation, with 5/8" drywall everywhere–efficient and sound absorbent.
Living room.
Master Bedroom.
Ok, now let’s begin drywalling.

Entries (RSS)